Interior Painting
Exterior Painting
Wall Paper
Wooden Polish

Interior wall painting (With repairing) Sq/Ft. Details
Interior wall painting (With repairing) Sq/Ft.
Includes only primer & Painting work
All Consumables Material & Lader to be provide onsite by Customer
If customer will request we can supply Material Also
Our 5 Step Painting process
Repair The damage wall for better finish
Apply primer.
Apply selected paint coat.
Apply selected paint coat — final one.
Clean the all spread paints on floor
Why is Primer Used before Painting?
There are different types of primers (wood primer, stain blocking primer, drywall and masonry primer) available in the market according to the surface we are going to paint. Also, It is not always necessary to use a primer prior to painting.
The purpose of the primer is to give On Masonry Walls –
To give a smooth and consistent finish. Walls may have efflorescence problems (white batches). Using efflorescence resistant primers will enhance the paint appearance.
a smooth finish to walls and to give better adhesion, consistent appearance. Using primer will
Why is Putty Used in Painting?
Putty is used after applying primer on the surface. It is used on walls to overcome
any plastering undulations (imperfections) on the wall and give a neat finish.
act as protective layers on walls. We can repaint the same wall without doing putty again.
fills minute pores
Interior Wall Painting
Pre Painting Process
Ensure sufficient curing has been done to the walls. Minimum 7-21 days.
Check the surface for any leakage or dampness. If found any such problems rectify them before starting to paint. Allow them to dry
Fill up any cracks. It should be treated with recommended crack filling process.
Fill up any nail holes with primer and cover the switch box with sand.
Make sure to remove all the movables from the room or place it in the center of the room and cover them.
Ensure to cover the floorings.
Surface Preparation
Cleaning – Clean the wall area. It should be free from dust.
Ensure to scrub off all the old paintings and loose plaster batches If you are painting an old wall surface.
Scrub with sand papers to give a dry finish.
Cover all the parts of the building that should be free from paint splatter such as doors, windows, switch boxes, furniture etc.
Painting
Fill up the door and windows sidewall cracks by caulking process.
Primer – Apply one coat of Primer. To give a smooth and consistent finish. Walls may have efflorescence problems (white batches). Using efflorescence resistant primers will enhance the paint appearance.
Putty – Apply one coat of putty. The putty paint will give a smooth finish to the wall and rectify any undulations on the wall surface. Warning – Putty are very expensive. If the wall has more undulations you end up with a big hole in the wallet.
Paint – After finishing putty ask electrical people to fix switch box. Once switch boxes are fixed to ensure to cover them up to avoid paints splattered all over them. Apply 2 coats of paint.

Fresh/New Home Painting (Exterior) Sq/Ft. Details
Fresh/New Home Painting (Exterior)
Includes applying of wall putty (3 coat) Apply Primer & Painting
All Consumables Material & Lader to be provide onsite by Customer
If customer will request we can supply Material Also
Our 5 Step Painting process
Apply primer.
Apply wall putty.
Apply wall putty — second coat.
Apply selected paint coat.
Apply selected paint coat — final one.
Exterior Painting
Pre Painting Process
Ensure there is no leakage on the walls.
Ensure there are no cracks on the walls. If found any cracks rectify them using recommended the crack filling process. Give them proper time to dry.
Ensure all the external wall plastering process has been completed fully. No batch works.
Make sure to paint the wall from the top.
Ensure all the staging requirements are provided.
Ensure the safety of painting labors.
Avoid any material transportation during the painting process.
Surface Preparation
Ensure the wall had sufficient curing time. 35 -50 days.
Ensure the wall is fully dried. Avoid painting on wet walls.
Ensure the openings of drainage pipes and scaffolding gaps are filled.
Make sure to cover the doors and windows to avoid paint splatter all over them.
Painting
Exterior Wall Primer – Apply one coat of recommended exterior wall primer.
Paint – Apply 2 coats of paint. Allow 4-6 hours of time between the coats.
Painting
Make sure to remove any dust and dirt.
Scrub the old wood finishes by sand paper.
Primer (1st Coat) – Mix the thinner with the wood primer to the recommended ratio and apply one coat. Allow them to dry (6-8 hours)
Putty – Generally 2 coats of primer will be applied on woods. Apply one coat of Putty or Lambi and allow them to dry.
Enamels – Now apply the enamel on the wood surface. Allow them to dry.
Paint – Now apply 2 coats of paint on the surface.

Exterior Grill & Railing Iron/Wood/painting Sq/Ft. Details
Exterior Grill & Railing Iron/Wood/painting Sq/Ft.
Includes only primer & Painting work
All Consumables Material & Lader to be provide onsite by Customer
If customer will request we can supply Material Also
Our 3 Step Painting process
Apply primer.
Apply selected paint coat.
Apply selected paint coat — final one.
Metal Surface Painting
Clean the metal surfaces by water to wipe off any dirt and grease or oil things.
Ensure that the metal surface is free from rust.
Sand the surface with sandpaper.
Scrub off rust from the metal
Painting
Metal Primer – Apply one coat of metal primer. Allow them to dry
Sanding – Sand the primer and make sure the surface is clean
Enamel – Apply 2 coats of recommended enamels. Make sure to give proper time to dry between coats

Wallpaper pasting Sq/Ft. Details
Wallpaper pasting process
If customer will request we can supply Material Also
Our 8 Step Pasting process
- Hanging wallpaper
- Prep the walls.
- Roll on the paste with a paint roller
- Seam inside corners
- Gently smooth out the paper
- Wipe down as you go
- Roll every seam
- Overlap and cut both pieces at once.

Quick book (Inspection for work) Details
One click for easy book
Let our expert help you identify & Wxplain the issue to visit site
Book for the minimum amount
Final price as per required work
Charges excludes material cost,

Home Painting ( Without Repair Exterior) Sq/Ft. Details
Home Painting ( Without Repair Exterior) Sq/Ft.
Includes Apply Primer & Painting
All Consumables Material & Lader to be provide onsite by Customer
If customer will request we can supply Material Also
Our 3 Step Painting process
Apply primer.
Apply selected paint coat.
Apply selected paint coat — final one.
Exterior Painting
Pre Painting Process
Ensure there is no leakage on the walls.
Ensure there are no cracks on the walls. If found any cracks rectify them using recommended the crack filling process. Give them proper time to dry.
Ensure all the external wall plastering process has been completed fully. No batch works.
Make sure to paint the wall from the top.
Ensure all the staging requirements are provided.
Ensure the safety of painting labors.
Avoid any material transportation during the painting process.
Surface Preparation
Ensure the wall had sufficient curing time. 35 -50 days.
Ensure the wall is fully dried. Avoid painting on wet walls.
Ensure the openings of drainage pipes and scaffolding gaps are filled.
Make sure to cover the doors and windows to avoid paint splatter all over them.
Painting
Exterior Wall Primer – Apply one coat of recommended exterior wall primer.
Paint – Apply 2 coats of paint. Allow 4-6 hours of time between the coats.
Painting
Make sure to remove any dust and dirt.
Scrub the old wood finishes by sand paper.
Primer (1st Coat) – Mix the thinner with the wood primer to the recommended ratio and apply one coat. Allow them to dry (6-8 hours)
Enamels – Now apply the enamel on the wood surface. Allow them to dry.
Paint – Now apply 2 coats of paint on the surface.

Wood Polish (Exterior/Interior) Sq/Ft. Details
Wood Polish (Exterior/Interior)
Our Professionals Fallows 5 Step Polishing Process to provice best experience.
The process starts from sand paper which is used to grind the element that is to be polished. Grinding is done manually by hand to smoothen the surface and remove major bulks and unwanted particles.
Once smooth surface is achieved as a result of grinding, next step is to apply laag dana on surface that is to be polished, it is transformed into liquid by mixing the grains in spirit. Suppose polish is being done
After application of laag dana and spirit mixture, next comes the plaster of paris filling, mixture of plaster of paris should be made in such a way that the color of paste matches with the color of wood to maximum extent. Fill the joints.
Once filling is complete, sandpaper is used again to smoothen the filled surface.
At this stage color of final finish must be decided. If doors or wooden structure is to be finished in natural color of the wood, Final finish of product depends upon the number of coats that are applied. For best finish a door requires
Interior wall painting (Without Repairing) Sq/Ft. Details

Includes only primer & Painting work
All Consumables Material & Ladder to be provide onsite by Customer
If customer will request we can supply Material Also
Our Painting process
Why is Primer Used before Painting?
There are different types of primers (wood primer, stain blocking primer, drywall and masonry primer) available in the market according to the surface we are going to paint. Also, It is not always necessary to use a primer prior to painting.
The purpose of the primer is to give
On Masonry Walls – To give a smooth and consistent finish. Walls may have efflorescence problems (white batches). Using efflorescence resistant primers will enhance the paint appearance. A smooth finish to walls and to give better adhesion, consistent appearance. Using primer will
Interior Wall Painting:-
Pre Painting Process
Ensure sufficient curing has been done to the walls. Minimum 7-21 days.
Check the surface for any leakage or dampness. If found any such problems rectify them before starting to paint. Allow them to dry
Fill up any cracks. It should be treated with recommended crack filling process.
Fill up any nail holes with primer and cover the switch box with sand.
Make sure to remove all the movables from the room or place it in the center of the room and cover them.
Ensure to cover the floorings.
Surface Preparation
Cleaning – Clean the wall area. It should be free from dust.
Ensure to scrub off all the old paintings and loose plaster batches Scrub with sand papers to give a dry finish.
Cover all the parts of the building that should be free from paint splatter such as doors, windows, switch boxes, furniture etc.
Painting
Fill up the door and windows sidewall cracks by caulking process.
Primer – Apply one coat of Primer. To give a smooth and consistent finish. Walls may have efflorescence problems (white batches). Using efflorescence resistant primers will enhance the paint appearance.
Putty – Apply one coat of putty. The putty paint will give a smooth finish to the wall and rectify any undulations on the wall surface. Warning – Putty are very expensive. If the wall has more undulations you end up with a big hole in the wallet.
Paint – After finishing putty ask electrical people to fix switch box. Once switch boxes are fixed to ensure to cover them up to avoid paints splattered all over them. Apply 2 coats of paint.
Fresh House Painting Sq/Ft Details

Wall Putty & Painting Sq/Ft.
Includes applying of wall putty (3 coat) Apply Primer & Painting
All Consumables Material & Lader to be provide onsite by Customer
If customer will request we can supply Material Also
Our 6 Step Painting process
Apply primer.
Apply wall putty.
Apply wall putty — second coat.
Apply selected paint coat.
Apply selected paint coat — final one.
Clean the all spread paints on floor
Why is Primer Used before Painting?
There are different types of primers (wood primer, stain blocking primer, drywall and masonry primer) available in the market according to the surface we are going to paint. Also, It is not always necessary to use a primer prior to painting.
The purpose of the primer is to give On Masonry Walls – To give a smooth and consistent finish. Walls may have efflorescence problems (white batches). Using efflorescence resistant primers will enhance the paint appearance. a smooth finish to walls and to give better adhesion, consistent appearance. Using primer will
Why is Putty Used in Painting?
Putty is used after applying primer on the surface. It is used on walls to overcome
any plastering undulations (imperfections) on the wall and give a neat finish.
act as protective layers on walls. We can repaint the same wall without doing putty again.
fills minute pores
Interior Wall Painting
Pre Painting Process
Ensure sufficient curing has been done to the walls. Minimum 7-21 days.
Check the surface for any leakage or dampness. If found any such problems rectify them before starting to paint. Allow them to dry
Fill up any cracks. It should be treated with recommended crack filling process.
Fill up any nail holes with primer and cover the switch box with sand.
Make sure to remove all the movables from the room or place it in the center of the room and cover them.
Ensure to cover the floorings.
Surface Preparation
Cleaning – Clean the wall area. It should be free from dust.
Ensure to scrub off all the old paintings and loose plaster batches If you are painting an old wall surface.
Scrub with sand papers to give a dry finish.
Cover all the parts of the building that should be free from paint splatter such as doors, windows, switch boxes, furniture etc.
Painting
Fill up the door and windows sidewall cracks by caulking process.
Primer – Apply one coat of Primer. To give a smooth and consistent finish. Walls may have efflorescence problems (white batches). Using efflorescence resistant primers will enhance the paint appearance.
Putty – Apply one coat of putty. The putty paint will give a smooth finish to the wall and rectify any undulations on the wall surface. Warning – Putty are very expensive. If the wall has more undulations you end up with a big hole in the wallet.
Paint – After finishing putty ask electrical people to fix switch box. Once switch boxes are fixed to ensure to cover them up to avoid paints splattered all over them. Apply 2 coats of paint.
Exterior Paint Includes (Wall Putty & Painting) Sq/Ft. Details

Exterior Paint Includes (Wall Putty & Painting) Sq/Ft.
Includes applying of wall putty (3 coat) Apply Primer & Painting
All Consumables Material & Lader to be provide onsite by Customer
If customer will request we can supply Material Also
Our 5 Step Painting process
Apply primer.
Apply wall putty.
Apply wall putty — second coat.
Apply selected paint coat.
Apply selected paint coat — final one.
Exterior Painting
Pre Painting Process
Ensure there is no leakage on the walls.
Ensure there are no cracks on the walls. If found any cracks rectify them using recommended the crack filling process. Give them proper time to dry.
Ensure all the external wall plastering process has been completed fully. No batch works.
Make sure to paint the wall from the top.
Ensure all the staging requirements are provided.
Ensure the safety of painting labors.
Avoid any material transportation during the painting process.
Surface Preparation
Ensure the wall had sufficient curing time. 35 -50 days.
Ensure the wall is fully dried. Avoid painting on wet walls.
Ensure the openings of drainage pipes and scaffolding gaps are filled.
Make sure to cover the doors and windows to avoid paint splatter all over them.
Painting
Exterior Wall Primer – Apply one coat of recommended exterior wall primer.
Paint – Apply 2 coats of paint. Allow 4-6 hours of time between the coats.
Wood Painting
Normally wooden surface required different types of finishes according to the client need. There are many types of paints for different uses and applications. So make sure to understand the requirement. Below is just an outline process
Painting
Make sure to remove any dust and dirt.
Scrub the old wood finishes by sand paper.
Wood Primer (1st Coat) – Mix the thinner with the wood primer to the recommended ratio and apply one coat. Allow them to dry (6-8 hours)
Putty – Generally 2 coats of primer will be applied on woods. Apply one coat of Putty or Lambi and allow them to dry.
Wood Primer Primer (2nd Coat)– Sand the applied the surface and start to paint the second coat of putty.
Enamels – Now apply the enamel on the wood surface. Allow them to dry.
Paint – Now apply 2 coats of paint on the surface.
Most helpful reviews

Ranjeet Singh
2022-08-07 15:41:29

adi rishi developer
2022-05-13 21:26:44

soc test patna
2022-05-04 08:05:00

soc test patna
2022-04-29 23:48:22

soc test patna
2022-04-29 18:59:42

soc test patna
2022-04-28 00:19:44

soc test patna
2022-04-27 23:04:43

Rohit Ray
2022-03-29 12:10:31
good job

Ranjeet Singh
2022-03-21 11:48:55
very good service done by service technician

Ranjeet Singh
2022-03-13 12:39:22